A big thanks goes out to the four men who helped fix our telemetry kit at the Purungat Bridge two weeks ago. It is not completely fixed yet but these guys helped me break up the old concrete and lay another 30 meters of new concrete over the data transmission cable from the telemetry modem to the water quality sonde. You can see some of the repairs in the background of the picture (just behind the two guys on the left side of the picture).
Nga'nga is the head engineer for the Mara Conservancy (white shirt). Thanks a million.
No comments:
Post a Comment